Thanet GhostWatch

Home
Search the Site
Forum
Chat Room
WAP Site
The Team
Membership
Rules
Newsletter
Investigations
Gallery
Video
Audio
Equipment
Historical
Phenomena
Sceptical
Social Events
Spirituality
Tales
Miscellaneous Articles
Guestbook
Links
Contact
Miscellaneous
Introduction


Thanet GhostWatch Property Investigation Report
The Granville Theatre, Ramsgate

The Granville Theatre
Photo: Bob

Page 1 of 7

Thanet GhostWatch Property Investigation would like to offer our sincere thanks to the owners of this property for consenting to this investigation.

 

Friday 30th January, 2009

Written by Bob and Keef.

Group: Bob, Sarah, Sue, Jen, Dawn, Dave, Keef, Jake, Paul and Julie.

20:00
Arrived, set up equipment where possible, conducted Base Line and Risk Assessment.

Locked-off Quad Cameras
Camera 1 - Theatre stage
Camera 2 - Lower Fire Escape
Camera 3 - Ladies' Toilets
Camera 4 - Theatre Balcony
  Quad Cameras View

 

Base Line Survey

  Temperature ºC Humidity %RH
Dance Studio 9.87 57.6
Dressing Room 1 7.9 59.4
Dressing Room 2 8.1 60.6
Dressing Room 3 8.0 60.9
Dressing Room Corridor 8.2 60.6
Stage Right 8.0 60.1
Corridor to Fire Exit 7.8 56.8
Stairs at Fire Exit 7.8 55.7

Centre Stage

7.7 52.6
Stage Left 8.8 58.3
Centre of Theatre Seating 9.8 57.9
Cinema 13.3 58.2
Men's Toilets 12.0 54.5
Disabled Toilet 12.2 59.9
Ladies' Toilet 11.1 56.5
Foyer 10.9 54.4
Entrance Lobby 10.9 54.6
Bar 11.9 58.8

 

Risk Assessment briefing, as required by our insurance, followed by a Spiritual Protection and Grounding in the Theatre for those who wished to participate.

Stood on the stage, various team members felt the screen on the balcony had appeared to have moved (as during the previous investigation). This was based on the lack of light visible from the emergency exit sign behind the screen compared to that earlier in the evening.
Tape markers were placed on the stage to indicate the spots where this light fitting was fully visible and markers where it was not.
Additionally, one of the Quad Cameras was placed on the balcony in order to monitor this screen and a Beam Alarm was positioned in front.

22:30
Set up the remainder of the equipment and placed trigger-objects throughout the building once the areas occupied by the public had been vacated.

23.12
Commenced investigation in the Theatre.

Page 2 >>

 

 

Unless stated otherwise, or loading from external sources, the content and design of this Site are
Copyright Thanet GhostWatch

Terms, Conditions and Disclaimer

 

Web Page Counter
Travelocity Flight Travel